Senator Edgardo J. Angara with the other leaders in the province graced the inaugration of Bazal bridge on January 21, 2011. The project was a pre-stressed concrete girder, type IV Bridge with a length of 110 linear meters and width of 5.4 meters. The project was made possible through the General Grant Aid Program of continue reading : Bazal Bridge facilitates transport to ASCOT Bazal Campus